Logo
STORE REQUISITION SLIP

U.P. Pt. Deen Dayal Upadhyaya Pashu-Chikitsa Vigyan Vishwavidyalaya
Evam Go-Anusandhan Sansthan, Mathura-281001 (UP)

Original Copy

Letter No: Date: 05-05-2026
College: ARIS CELL (AKMU) Department: ARIS CELL (AKMU )
Nature of Requirement: Repair/Maintenance Funding Source: University Grant
Note: Each Indent must pertain to only one category.
Project/Scheme Title:
Sanctioned Amount (Enclosed Annexure ): β‚Ή0.00

Purpose & Justification:
Online UPS 3KVA installed on the internet server in UPS is not working for many days due to which internet facility get disrupted in case of power cut.


Details of Items:
S.N. Item Description & Catalogue No (if applicable) Specifications Make/Brand(Only in case of RC) Qty Unit Cost (β‚Ή) Approx Cost (β‚Ή)
No items added
Specifications must be generic and non-proprietary (not brand specific).
Sub Total: β‚Ή0.00
GST: β‚Ή0.00
Grand Total: β‚Ή0.00
AMC Required: No AMC Duration: N/A

Description of item / Cost / Date of Purchase / Previous Repair Details and Estimated Repair Cost (Enclosed Annexure):
Online UPS 3KVA Cost Rs 71300.00 with GST Date of Purchase 14-10-2019
Previous Repair Details:-
Previous Repair Date: 12-07-2023 Previous Repair Cost Rs. 12,213.00 with GST

Certification:
It is certified that the rates of the above items/services have been verified from different sources and found reasonable.( Enclosed rate reasonability Annexure )

(Indentor Signature)
Date: _____________
(HOD/Officer Signature)
Date: _____________
(Dean/Director Signature)
Date: _____________