STORE REQUISITION SLIP

U.P. Pt. Deen Dayal Upadhyaya Pashu-Chikitsa Vigyan Vishwavidyalaya
Evam Go-Anusandhan Sansthan, Mathura-281001 (UP)

Original Copy

Letter No: 04/Vc Camp Office@2026 Date: 06-05-2026
College: - Department: Vice Chancellor Camp Office
Nature of Requirement: Non-Recurring Funding Source: University Grant
Note: Each Indent must pertain to only one category.
Project/Scheme Title:
Sanctioned Amount (Enclosed Annexure ): β‚Ή0.00

Purpose & Justification:
The Air Conditioner installed in the VC Camp Office was procured in the year 2012 and has been in continuous use since then. Over the years, due to prolonged usage and natural wear and tear, the unit has become outdated and its performance has significantly declined. The AC is now inefficient in cooling, consumes higher electricity, and requires frequent repairs and maintenance, resulting in increased expenditure and operational inconvenience. Being an old model, it also lacks modern energy-efficient features available in newer systems. In view of its deteriorated condition and reduced efficiency, replacement of the existing AC with a new energy-efficient unit has become necessary to ensure proper functioning of the office and to maintain a comfortable working environment.


Details of Items:
S.N. Item Description & Catalogue No (if applicable) Specifications Make/Brand(Only in case of RC) Qty Unit Cost (β‚Ή) Approx Cost (β‚Ή)
1 SPLIT AC with instalation 1.5 Tonne - 1.00 45,000.00 45,000.00
Specifications must be generic and non-proprietary (not brand specific).
Sub Total: β‚Ή45,000.00
GST: β‚Ή0.00
Grand Total: β‚Ή45,000.00
AMC Required: No AMC Duration: N/A

Certification:
It is certified that the rates of the above items/services have been verified from different sources and found reasonable.( Enclosed rate reasonability Annexure )

(Indentor Signature)
Date: _____________
(HOD/Officer Signature)
Date: _____________
(Dean/Director Signature)
Date: _____________